检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:唐捷 王乐 黄维 刘桂婵 TANG Jie;WANG Le;HUANG Wei;LIU Gui-chan(Electric Power Research Institute of Cruangxi Power Grid co.,Ltd.,Nanning 530023,China)
机构地区:[1]广西电网有限责任公司电力科学研究院,南宁530023
出 处:《电工材料》2018年第6期18-20,24,共4页Electrical Engineering Materials
摘 要:针对一起雷击引起避雷线断线并挂搭在铁路接触网导致接触网跳闸的事件原因进行分析。事件是由强雷击导致#4杆塔避雷线断线,而后避雷线脱落碰到A相导线,在断线冲击力及短路故障电流的作用下#5塔避雷线悬垂线夹处烧断脱落。最后提出了重要交叉跨越点防止避雷线断线的对策:更换短路热稳定容量不达标的避雷线、优化悬垂金具布置方式、安装线路避雷器。In this paper, the causes of an event caused by a lightning strike causing the lightning protection line to break and hangs on the railway contact network to cause the contact network to trip are analyzed. The event is caused by a strong lightning strikes #4 tower lightning line broken,and then the lightning protection line falls off and hits the A-phase conductor. Under the action of the broken line impact force and the short-circuit fault current, the #5 tower lightning line suspension line clip is blown off. Finally, the countermeasures for preventing the lightning break of the lightning protection line from the important cross-over crossing points are proposed: replacing the lightning protection line with short-term thermal stability capacity that is not up to standard,optimizing the layout of the overhanging fittings, and installing the line arrester.
分 类 号:TM863[电气工程—高电压与绝缘技术]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145