检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:耿晔宽 高芬芬 周成君 Geng Yekuan;Gao Fenfen;Zhou Chengjun(Jiangsu East China Engineering Design Co.,Ltd,Nanjing 210007,Jiangsu,China)
机构地区:[1]江苏华东工程设计有限公司,江苏南京210007
出 处:《岩土工程技术》2018年第6期313-316,共4页Geotechnical Engineering Technique
摘 要:针对软土地区深基坑工程"时空效应"显著的特点,结合南京河西地区某深基坑工程案例,分析深厚软土条件下基坑产生大变形的机理,通过采取支撑加固、限载、卸载、隔离桩、配筋垫层、底板先行施工等综合控制措施,有效控制了基坑变形速率,保证基坑施工得以安全顺利实施。Considering the "time and space effect" of deep excavations in soft soil area is significant,based on excava- tions case in Hexi area,Nanjing,the mechanism of large deformation of excavations under deep soft soil is analyzed.Comprehensive control measures such as supporting reinforcement,load limiting,unloading,isolation piles,reinforcement and thickening cushion,and floor construction are adopted,the deformation rate of excavations is effective controlled,which guarantees the evcavations to be carried out safely and smoothly.It provides reference for deformation control of excavations engineering in similar soft soil area.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117