地下室底板取消沉降后浇带的技术分析与应用  被引量:2

Technical Analysis and Application of Settlement Post-Cast Band Abolished in Basement Floor

在线阅读下载全文

作  者:范荣辉 李鑫奎 谭英辉 FAN Ronghui;LI Xinkui;TANYinghui(Shanghai Construction No.7 (Group)Co.,Ltd.,Shanghai 200050,China;Shanghai Construction Group Co.,Ltd.,Shanghai 200080,China)

机构地区:[1]上海建工七建集团有限公司,上海200050 [2]上海建工集团股份有限公司,上海200080

出  处:《建筑施工》2018年第12期2044-2047,共4页Building Construction

基  金:上海市科学技术委员会科研计划项目课题(17QB1402100);上海建工集团重点课题(17JCSF-04)

摘  要:以上海董家渡金融城工程项目大体积地下室底板施工为例,利用有限元方法对比分析在不同施工工况中,设置后浇带和施工缝2种施工方案的基础底板沉降变形及结构应力。结果表明:取消主楼与主楼之间的沉降后浇带是完全可行的,避免了设置沉降后浇带可能引起的各种施工问题。Taking the construction of large-scale basement floor of Shanghai Dongjiadu financial city project as an example, the finite element method is used to analyze the settlement deformation and stress of foundation floor of two kinds of construction schemes: setting post-cast band or construction joint in different construction conditions. The results show that it is feasible to abolish the settlement post-cast band between the neighboring main buildings, which can avoid various construction problems caused by setting settlement post-cast band.

关 键 词:地下室底板 沉降后浇带 施工缝 计算分析 

分 类 号:TU375[建筑科学—结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象