检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:董松[1] 张津铨 朱帅帅 徐亮 钱晨 DONG Song;ZHANG Jinquan;ZHU Shuaishuai;XU Liang;QIAN Chen(Jiangsu Nantong No.2 Construction Engineering (Group)Co.,Ltd.,Nantong,Jiangsu 226200,China)
机构地区:[1]江苏南通二建集团有限公司,江苏南通226200
出 处:《建筑施工》2018年第12期2080-2082,共3页Building Construction
摘 要:苏州中润广场在深基坑施工过程中发生了管涌现象,通过对事故原因进行分析,制订了改用大功率潜水泵、加厚垫层、对坑中坑基础底板二次浇筑等安全可靠、合理可行的处理方案,有效解决了管涌问题,为类似深基坑工程抢险施工提供了技术支撑。The piping phenomenon occurred in the construction of deep foundation pits in Suzhou Zhongrun Square. Through analyzing the causes of accidents,a safe and reliable,proper and feasible treatment scheme of using highpower submersible pumps,thickening cushions and secondary casting of pit in foundation pit was developed,which effectively solved the piping problem and provided technical support for the emergency construction of similar deep foundation pit engineering.
分 类 号:TU753.66[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117