作 者:程华 郑欣豪 任俊儒 戴睿熙 周强 Cheng Hua;Zheng Xinhao;Ren Junru;Dai Ruixi;Zhou Qiang(Army Logistics University,Chongqing 400000)
机构地区:[1]陆军勤务学院,重庆400000
出 处:《粉煤灰综合利用》2018年第6期106-109,共4页Fly Ash Comprehensive Utilization
摘 要:以某索拱架式移动机库屋盖为例,分别基于直接法和降温法进行拉索预应力模拟,并求解杆件截面正应力和拉索轴应力大小及误差。结果表明两种方法结果相差极小,降温法适用于模拟施工顺序,但Instate法因只能在第一荷载步使用而不能用于施工顺序模拟。Taking the roof of a cable arched mobile hangar as an example,the prestressing simulation of the cable is carried out based on the direct method and the cooling method respectively,and the normal stress of the section and the stress and the error of the cable shaft are solved. The results show that the results of the two methods are very small,and the cooling method is suitable for simulating the construction sequence,but the Instate method can only be used in the first load step and cannot be used in the construction sequence simulation.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.117.121.71