时间剖面上分析陷落柱充水性的探讨  被引量:16

Analysis of Water-Filling of Subsided Column Based on Time Section

在线阅读下载全文

作  者:杨双安 张淑婷 郭勇洪 魏书宏 李连英 张胤彬 

机构地区:[1]山西煤田地质综合普查大队,山西晋中030600

出  处:《中国矿业大学学报》2001年第5期503-505,522,共4页Journal of China University of Mining & Technology

摘  要:通过对充水型、不充水型陷落柱地质模型的研究 ,发现绕射波的射线穿过陷落柱内的低速体产生明显的时间延迟 ,并且充水型陷落柱比不充水型陷落柱的延迟绕射波延迟时间要长 ;由延迟时间推算出陷落柱内的充填速度 ,据此来分析陷落柱的充水性 .The geological models for both water filled and non water filled subsided columns were researched. The result shows that the penetration of diffraction wave rays through the low velocity zone in subsided column results in an obvious time delay, with the water filled subsided column being longer in delayed time than that of the non water filled subsided column. The delayed time can be used for calculating the filling velocity and the water filling situation of the subsided column. This method can be used to analyze directly the water filling situation of subsided columns from the seismic time section.

关 键 词:陷落柱 充水性 延迟时间 绕射波 矿区水文地质 煤矿 

分 类 号:P641.461[天文地球—地质矿产勘探]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象