检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王伯惠
出 处:《公路》2002年第4期38-48,共11页Highway
摘 要:While the Stoncutters Bridge of Hong Kong, a 1 018 m span cable stayed bridge is to be put into construction soon, the problem of the extreme span length of cable stayed bridge has been raised once again within the bridge engineeing circles. Detailed discussion about several main topics concerned are made in this paper, and it is found that even for a span length up to 8 000 m such factors as the cable strength, decrease of the effective elastic modulus of the cable material, critical wind velocity of flutter of long span cable stayed bridge structure etc are not the obstructions while the axial force induced in the girder by the horizontal components of the cable forces is the first problem that will prevent the develope ment of span length and have to be overcome.While the Stoncutters Bridge of Hong Kong, a 1 018 m span cable stayed bridge is to be put into construction soon, the problem of the extreme span length of cable stayed bridge has been raised once again within the bridge engineeing circles. Detailed discussion about several main topics concerned are made in this paper, and it is found that even for a span length up to 8 000 m such factors as the cable strength, decrease of the effective elastic modulus of the cable material, critical wind velocity of flutter of long span cable stayed bridge structure etc are not the obstructions while the axial force induced in the girder by the horizontal components of the cable forces is the first problem that will prevent the develope ment of span length and have to be overcome.
分 类 号:U448.27[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249