检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王树林[1]
机构地区:[1]水利部山西省水利水电勘测设计研究院,太原030024
出 处:《防渗技术》2002年第1期15-18,共4页Technique of Seepage Control
摘 要:册田水库南副坝由于坝基渗漏管涌严重 ,水库长期以来一直不能正常运行 ,是国家重点病险水库之一。在水库除险加固工程设计中 ,首次采用了塑性混凝土防渗墙技术。实践证明 :此项技术具有防渗效果好、投资低、施工简便、进度快、质量高等优点 ,成功地解决了长期以来存在的渗透稳定问题。简介如下 。Cetian Reservoir is one of the seriously dangerous reservoirs in our country because of severe seepage and piping in the foundation of south secondary dam. The technique of seepage control wall of plastic concrete is used for the first time in the design of stabilization for dangerous release of the reservoir. It is proved by the fact that this technique has the advantages of better seepage control effect, lower investement, more simple and convenient construction, more rapid rate of progress and higher quality, and that the problems of seepage and stabilization existed for a long time are solved successfully.
分 类 号:TV223.42[水利工程—水工结构工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.31