检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《Journal of Central South University》2014年第7期2779-2792,共14页中南大学学报(英文版)
基 金:Project(51066002/E060701) supported by the National Natural Science Foundation of China;Project(U0937604) supported by the NSFC-Yunnan Joint Fund of China
摘 要:An optimal method for prediction and adjustment on byproduct gasholder level and self-provided power plant gas supply was proposed.This work raises the HP-ENN-LSSVM model based on the Hodrick-Prescott filter,Elman neural network and least squares support vector machines.Then,according to the prediction,the optimal adjustment process came up by a novel reasoning method to sustain the gasholder within safety zone and the self-provided power plant boilers in economic operation,and prevent unfavorable byproduct gas emission and equipment trip as well.The experiments using the practical production data show that the proposed method achieves high accurate predictions and the optimal byproduct gas distribution,which provides a remarkable guidance for reasonable scheduling of byproduct gas.An optimal method for prediction and adjustment on byproduct gasholder level and self-provided power plant gas supply was proposed.This work raises the HP-ENN-LSSVM model based on the Hodrick-Prescott filter,Elman neural network and least squares support vector machines.Then,according to the prediction,the optimal adjustment process came up by a novel reasoning method to sustain the gasholder within safety zone and the self-provided power plant boilers in economic operation,and prevent unfavorable byproduct gas emission and equipment trip as well.The experiments using the practical production data show that the proposed method achieves high accurate predictions and the optimal byproduct gas distribution,which provides a remarkable guidance for reasonable scheduling of byproduct gas.
关 键 词:HP filter Elman neural network least square support vector machine gasholder level self-provided power plant
分 类 号:TM62[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249