功果桥水电站土石过水围堰设计  被引量:5

Design of Overflow Earthrock Cofferdam,Gongguoqiao Hydropower Project

在线阅读下载全文

作  者:张鹏飞[1] 张锦堂[1] 黄天润[1] 张亮[1] 杨静安[1] 

机构地区:[1]中国水电顾问集团西北勘测设计研究院有限公司,西安710065

出  处:《西北水电》2014年第3期40-42,共3页Northwest Hydropower

摘  要:修筑在大流量、深厚覆盖层河道上的土石过水围堰,过水期间的抗冲刷及整体稳定是设计的难点。文章对围堰设计思路、关键技术问题及其解决措施进行了全面阐述。功果桥水电站围堰无论是过水围堰高度、覆盖层深度、过水流量,还是贫胶凝粗粒料施工规模均处于中国先进水平。围堰经2 a的过流检验,未发生破坏,实现了预期目标。Design of the overflow rockearth cofferdam built on the river with high discharge and the deep & thick overburden on the ri- verbed shall focus on the scouring protection and integrated stability of the cofferdam during the overflow operation. In the paper, the cofferdam design concept, key technical points and handling measures are fully described. In China, the overflow cofferdam height, overburden depth, overflow discharge and the construction scale of the low-cementitious coarse materials of Gongguoqiao Hydropower Project all are at advanced level. Experienced by 2 a overflow operation, the cofferdam is not failed and the expected objective is reached.

关 键 词:土石过水围堰 深厚覆盖层 碾压贫胶凝粗粒料 基坑充水 功果桥水电站 

分 类 号:TV551.36[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象