纳子峡水电站混凝土面板砂砾料堆石坝填筑质量控制  被引量:1

Quality Control of Embankment Filling of Concrete Face Gravel-fill Dam,Nazixia Hydropower Project

在线阅读下载全文

作  者:金永才[1] 

机构地区:[1]中国水电顾问集团西北勘测设计研究院有限公司,西安710065

出  处:《西北水电》2014年第3期46-49,共4页Northwest Hydropower

摘  要:纳子峡水电站工程大坝坝型为混凝土面板砂砾石坝,目前大坝填筑已完工。施工过程中建立和实施了有效的质量监督机制,主坝砂砾料通过覆盖层开挖、采料、卸料、摊铺、洒水、碾压、干密度测定等质量控制,使得大坝填筑碾压质量全面满足设计要求。Nazixia Hydropower Project is with a concrete face gravel-fill dam. Currently, the embankment filling is fulfilled. During the embankment filling, the effective quality supervision system is established and implemented. Through the quality control of overburden excavation, material selection, unloading, spreading, water spraying, roller compaction, and measurement of dry intensity of the gravel materials for the main embankment, quality of the roller compaction of the embankment filling satisfy the design requirements.

关 键 词:高海拔地区 砂砾料 堆石坝 填筑 质量控制 

分 类 号:TV641.43[水利工程—水利水电工程] TV512

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象