检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国水电顾问集团西北勘测设计研究院有限公司,西安710065 [2]陕西镇安抽水蓄能有限公司,西安710061
出 处:《西北水电》2014年第3期79-83,共5页Northwest Hydropower
摘 要:中国在建和拟建的大型水电站多处于强地震活动区域,水电站厂房的抗震性能问题十分突出。长期以来,水电站厂房结构的抗震计算大多是基于线弹性材料,未考虑水工钢筋混凝土在高地震荷载作用下所显现的强非线性特征。文章以实际工程项目——怒江赛格水电站厂房为研究对象,运用静力弹塑性方法分析了混凝土进入塑性阶段后厂房结构的抗震性能。A couple of large-sized hydropower stations built and under construction are located in strong earthquake occurrence regions. Therefore, the aseismic performance of those hydropower stations is significant. In the past, the aseismic computation of the power- house structure is based on the linearly elastic materials. The strong non-linear feature of the hydraulic reinforced concrete appearing under action of the high earthquake load is not considered. With the engineering practice of the powerhouse of Saige Hydropower Project on the Nujiang River, in this paper, the aseismie performance of the powerhouse structure after its concrete comes into plastic stage is analyzed by application of the push-over analysis method.
关 键 词:水电站 厂房 抗震分析 静力弹塑性 push-over
分 类 号:TV731[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.208