检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《给水排水》2002年第4期1-5,共5页Water & Wastewater Engineering
摘 要:实施自来水厂排泥水处理 ,首先需要确定自来水厂的污泥量 ,就此将污泥量分为排泥水量和干污泥量。排泥水量可根据沉淀池排泥运行方式和滤池反冲洗运行方式来确定。对于干污泥量的确定介绍了计算法和物料平衡分析法 ,物料平衡分析法可作为计算法的补充 ,对计算法的结果进行校核。The liquid sludge water discharged from waterworks has to be treated. The sludge discharge of waterworks could be divided into two parts: the liquid sludge water and the solid dry sludge. The liquid sludge water could be determined by the sludge discharge manner of sedimentation tanks and the backwashing operation of the filters. There are two ways to determine the solid sludge discharge, namely, the calculation and mass balancing analysis. The later might be an indispensable complement and checking to the former. These two methods are presented and compared in this paper.
分 类 号:TU991.35[建筑科学—市政工程] X703[环境科学与工程—环境工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222