检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《水利学报》2002年第5期3-8,共6页Journal of Hydraulic Engineering
摘 要:目前面板堆石坝的高度已从 10 0m级发展到 2 0 0m级 ,由于分期施工 ,高面板堆石坝的坝体变形性状更加复杂 .本文以 2 5 0m典型高面板坝为例 ,采用清华非线性K -G模型 ,分析了高面板坝的一些特殊变形问题 ,提出 :优化施工临时剖面 ,以防止坝体在施工期出现过大的差异变形而产生裂缝 ;分期面板的浇筑高程要与堆石体的顶部保持一定的高差 ,以防止面板与支承堆石体间出现脱空 ;对高坝、特别是峡谷地区的高面板坝 ,要注意减少面板的法向变形 ,以控制坝肩附近周边缝和垂直缝的三向变形 .A typical CFRD,250m in height, is analyzed as an example to study the possible special deformation problems happened to high CFRD. The K-G model developed by Tsinghua University is applied. It is concluded that :1) to prevent from cracking due to excess difference of deformation, the temporary cross section of the dam in different stages of construction should be optimized; 2) a certain elevation difference between the top of rockfill and top of concrete face plate must always be kept in the process of construction, to avoid from the occurrence of void between the embankment and face plates; 3) attention must be paid to the control of the normal direction defromation of face plates so that the 3-D deformations of the peripheral joints and adjacent vertical joints can be controlled.
分 类 号:TV641.43[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.21.93.159