检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]武汉大学动力系,湖北武汉430072 [2]华中科技大学水电系,湖北武汉430074 [3]湖北省电力建设公司,湖北武汉430060
出 处:《水力发电》2002年第5期44-46,共3页Water Power
摘 要:大型冲击式水轮发电机组有其特殊性和复杂性 ,笔者针对以礼河水电厂实际 ,设计和开发了一种基于可编程控制器 (PLC)的冲击式水轮发电机组现地控制单元 (LCU)的实施方案和相应的装置。该装置自 1995年投入运行以来 ,运行情况良好 ,表明了所述方案和装置是成功的 。The large sized Pelton turbo generator unit has its particularities and complexities. The author designs and develops, on the basis of the actual conditions of Yilihe Hydropower Station, an field logic control unit of Pelton turbo generator unit based on programmable logic controller and its implementation alternative and corresponding device. Since its operation in 1995, such device has been in good conditions, which shows the above mentioned alternative and device is successful. It can be used as a reference for the automatic control of similar hydropower stations at home.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3