万安溪面板堆石坝原型观测资料分析  被引量:5

Analysis on the prototype observation data of Wan'anxi concrete face rockfill dam

在线阅读下载全文

作  者:戴妙林[1] 吴宏明[1] 沈洪俊[1] 刘宗汉 

机构地区:[1]河海大学水电学院,江苏南京210098 [2]万安溪水力发电厂,福建龙岩364000

出  处:《水力发电》2002年第5期52-55,共4页Water Power

基  金:河海大学D9910 0 0 73课题研究成果

摘  要:万安溪面板堆石坝最大坝高 93 8m ,坝顶长 2 10m ,1990年 12月开工 ,1994年 8月开始蓄水。在施工期及运行初期布置了各种类型的观测设备 ,其中包括坝体内部和外部的位移观测 ,面板周边缝位移和板间缝开合度观测 ,面板应力和应变观测 ,大坝渗流量观测 ,以及面板上部裂缝监测。通过对 1999年观测资料的分析和评价 ,表明坝体变形总体正常 ,面板大部区域是压应变 。The Wan'anxi concrete face rockfill dam started to be built in December 1990 and impounded water in August 1994, with the maximum dam height of 93.8 m and the crest length of 210 m. During the construction period and the early operation, various observation devices have been arranged, including displacement observation inside and outside the dam body, the observation on the displacement of peripheral joint of face slab and the opening of joints among slabs, the slab stress and strain observation, and the crack observation in the top of face slab. The analysis and assessment on the observation data from 1999 up to now show that the deformation of the dam body is normal generally and the compressive strain occurs in the most area of face slab. The dam is stable with low seepage.

关 键 词:面板堆石坝 原型观测 万安溪水电站 

分 类 号:TV641.43[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象