进路法回采顶柱人工假顶的稳定性分析  被引量:28

Stability Analysis of the Artificial Roof in Drift Stoping of Crown Pillar

在线阅读下载全文

作  者:赵伏军[1] 李夕兵[1] 赵国彦[1] 刘国富[2] 王剑波[2] 

机构地区:[1]中南大学 [2]山东新城金矿

出  处:《金属矿山》2002年第4期27-29,共3页Metal Mine

摘  要:针对用进路法回采顶柱的人工假顶暴露形状为矩形的矿山地下结构 ,应用薄板理论和能量原理对其稳定性进行分析。通过建立进路结构力学模型 ,得出了假顶变形阶段的挠曲、应力与假顶的强度、受力及工程尺寸等参数的关系式 ,并具体应用于新城金矿的顶柱回采实践中 ,结果表明The thin plate theory and energy principle were applied in the analysis of the stability of the artificial roof in drift stoping of crown pillar,whose exposed shape was of retangular mine underground structure,the relationships between the parameters such as the deflection,stress and strength of deforming artificial roof and the engineering size were found and used later in the crown pillar stoping practice at Xincheng Gold Mine.The results show it is of good guidance significance in the real production to analyse the stope stability by this theoretical method.

关 键 词:进路法 回采顶柱 人工假顶 稳定性 

分 类 号:TD856.131[矿业工程—金属矿开采]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象