西气东输沙漠地段的大口径管道施工  被引量:1

Large Diameter Pipeline Construction the West-East Natural Gas Transportation Project in Desert Land

在线阅读下载全文

作  者:李文东[1] 

机构地区:[1]中国石油天然气管道第二工程公司

出  处:《石油工程建设》2002年第3期16-17,共2页Petroleum Engineering Construction

摘  要:西气东输管道工程需多次穿越沙漠地段 ,根据沙漠地带地形起伏较大、沙丘活动性较强、沙漠抗剪强度小、凝聚力极差等特点 ,通过采取相应的施工机具和措施 ,有效地解决了运管、管沟开挖以及防沙固沙等问题。文章详细介绍了沙漠地带管道施工方法、防沙固沙措施以及施工中的注意事项。The pipeline of West-East Natural Gas Transportation Project passes through desert land several times. Based on characteristics of sand wave hypsography, active sand dune mobility, lower shear strength and poorer coherence and so on in desert land, relevant machines and tools were used and proper methods were carried out. And therefore some problems such as pipe channel trenching, pipeline operation, sand-defense, and sand-solidification etc were solved effectively. The article introduced in details the technologies of pipeline construction in desert land, measures of sand-defense and sand-solidification, as well as attention items should be paid when pipeline in construction.

关 键 词:大口径管道 施工 沙漠地带 防沙固沙 西气东输管道工程 

分 类 号:TE973[石油与天然气工程—石油机械设备]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象