用沙坝矿高溜井的技术改造  被引量:2

Technical Renovation of High Raise in Yongshaba Mine

在线阅读下载全文

作  者:吴爱祥[1] 郭立[1] 余佑林[1] 高尔泰 罗曼 

机构地区:[1]中南大学,湖南长沙410083 [2]开磷集团公司,贵州开阳县550302

出  处:《矿业研究与开发》2002年第3期4-6,共3页Mining Research and Development

摘  要:竖井改作溜井存在一系列的技术难题需要解决 ,如何防治溜井堵塞事故是其中的关键技术之一。用沙坝矿针对高溜井试运行时出现的矿流不畅及堵塞现象 ,采取了很多处理措施 ,效果不佳。在综合分析了现场情况 ,根据散体流动规律及放矿学理论 ,提出了溜井改造技术方案。推荐的最佳方案在实施后 ,经过一个月的连续试车运行 ,共放出矿石 3万t ,溜井运行情况良好 ,改造取得圆满成功。For transformation of shaft into raise, several technical issues remain unsolved, one of which is jamming. In Yongshaba Mine, many measures are adopted to address unsmoothed ore flow and raise jamming in trial operation of the high raise which used to be a shaft, with limited effectiveness. Proposals for technical renovation of the raise were suggested based on a comprehensive analysis of the field situation and according to the bulk flow rule and ore draw theory. Since the commission of the recommended optimal proposal, for about one month, continuous pilot running has drawn 30 kt ore , with good operational performance, indicating that the renovation is a great success.

关 键 词:高溜井 堵塞 底部结构 技术改造 

分 类 号:TD266[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象