检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:邱坤态[1] 敬国超[1] 董科武[1] 曾俊[1] 程爱巧[1]
机构地区:[1]河南油田分公司第一采油厂,河南桐柏474780
出 处:《河南石油》2002年第2期18-20,共3页Henan Petroleum
摘 要:针对双河油田的注采结构的现状及特征,通过近几年来在注采结构调整方面的实践与应用,总结出了油田在特高含水后期开发阶段,实现油田控水稳油目标的途径和方法,注水结构调整主要是结合地质特点,减少欠注层段,减少和控制不合理超注井层段和改善吸水剖面;在采液结构调整上,控制高含水层段的注入,加强中低渗透层段的注入,封堵高渗透、高水淹干扰层段,解放动用较差的中低渗透层段,改善平面上采出不平衡的状况。通过实施注采结构调整,双河油田在特高含水后期实现了高效开发。In view of the status and characteristics of injection-production structure in Henan oilfield, ways and methods to realize the target of water-cut control and production stabilization at late development stage with extra-high water-cut are summarized in this paper on the basis of practices of injection-production structure adjustment. Measures adopted in injection structure adjustment mainly are reducing the number of underinjec-tion layers, reducing and controlling irrational overinjec-tion layers and improving water absorption profile; measures taken in fluid production structure adjustment include controlling water injection in layers with high water-cut, strengthening water injection in low permeability layers, plugging highly permeable layers and watered out interference layers, putting layers with medium permeability into production and improving the status of unbalanced recovery in plane. Highly efficient development at late stage with high water-cut has been realized in Shuanghe oilfield through injection structure adjustment.
分 类 号:TE341[石油与天然气工程—油气田开发工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.127