武钢第一烧结厂自动化系统的新水平  

SINTER PLANT AUTOMATION ON A NEW LEVEL AS IMPLEMENTED AT WISGCO'S NO 1 SINTER PLANT

在线阅读下载全文

作  者:孙文东[1] D.Bettinger G.Straka K.Stohl 

机构地区:[1]武汉钢铁(集团)公司 [2]奥钢联工程技术公司

出  处:《钢铁》2002年第4期7-11,共5页Iron and Steel

摘  要:20 0 0年 9月武钢同奥钢联签订了烧结厂自动化包 (二级自动化和过程优化 )供货合同 ,包括一套工艺信息系统和多个在线工艺模型。其关键特点是生产率提高 3%~ 5 %、焦炭消耗减少 2 %以上、系统作业率超过 99.5 %。系统于 2 0 0 1年 4月 (合同开始执行后仅 7个月 )投入运行。In September 2000 Wuhan Iron and Steel (Group) Co. placed an order with VAI for the postinstallation of a sinter plant automation package (Level 2 automation and process optimization) which included a process information system and various online process models.Key benchmarks of the installed automation package included productivity increase of 3 % 5 %, reduction of coke consumption by more than 2 % and system availability exceeding 99.5 %. The automation system was started up in April 2001, only seven months after the commencement of the project. This paper describes the installed modules as well as initial results at WISCO's No 1 Sinter Plant.

关 键 词:第一烧结厂 自动化系统 烧结 武汉钢铁公司 

分 类 号:TF325[冶金工程—冶金机械及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象