检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陈志刚[1]
出 处:《华中电力》2002年第3期17-19,46,共4页Central China Electric Power
摘 要:为优化配置能源资源,推进西部大开发,根据“西电东送”战略步署,“十五”期间广东从西部受电10000MW。电源来自广西(天生桥电站1680MW)、贵州(4000MW)、云南(1600MW)、湖南(600MW)和湖北(三峡电力3000MW)。向广东送电的西电电源多为水电,具有送电规模大、季节性强、送电时序相对集中、送电距离远等特点。在分析“十五”期间向广东送电电源特点的基础上,就“西电东送”的新局面对广东电力系统的发展规划及生产运行的影响进行初步的分析和探讨。The project'Power from West to East'is the backbone and milestone project of west exploiting.In rder to achieve energy optimization and accelerate the project of west exploiting,the state council make a decision of transmitting power from western province to guangdong province,The total capacity will reach1000MW by the end of the10th five-year planning?The power source comes from guangxi province(1680MW of tian sheng qiao hydroelectric power station)and guizhou province(4000MW)and yunnan province(1600MW)and hunan province(600MW)and hubei province(3000MW of three-gorge hydroelectric power station).most of this pow er source are seasonal,The main characteristic of power source of project'Power from West to East'in cludes big capac ity and long dis tance and con-centrate on schedule.In this paper,based on analyzing the characteris tic of pow er source from west,The influ ence of the pro ject'Power from West to East'affecting on the planning and operation of guangdong power system is analyzed.
分 类 号:TM715[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28