检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国石油集团地球物理勘探局,河北涿州072751 [2]石油大学,北京102200
出 处:《石油物探》2002年第2期141-143,148,共4页Geophysical Prospecting For Petroleum
摘 要:目前常用的共转换点计算公式是在单层均匀介质模型条件下导出的。Thomsen于 1999年提出多层介质条件下的共转换点计算公式 ,其假设前提与实际情况更为接近 ,对纵横波速度比的定义也更为精细。通过采用上述 2种不同计算方法对实际资料进行共转换点分选及叠加处理并对比 。The commonly used formula so far for common conversion point (CCP) calculation are derived under assumption of homogeneous medium model with single layer. Thomsen proposed in 1999 a new set of formula for CCP estimation under assumption of multilayerd medium. Due to the multilayered medium is more close to the real situation, Thomsen's definition of velocity ratio between compressional and shear waves is more accurate. We performed CCP sorting and stacking on real data with the above mentioned calculation procedures and compared their results, which reveals that the multilayed calculation procedure is superior to single layered one.
关 键 词:PS转换波 共转换点 计算方法 应用 纵波 横波 纵横波速度比 地震勘探
分 类 号:P631.42[天文地球—地质矿产勘探]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.80