检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陈旭[1] 林雄 吴宝英[1] 卜广全[3] 杨军[3]
机构地区:[1]广东省电力设计研究院,广东广州510600 [2]广东省广电集团公司,广东广州510600 [3]中国电力科学研究院,北京100085
出 处:《中国电力》2002年第8期33-36,共4页Electric Power
摘 要:为配合国家西部大开发战略,“十五”期末贵州、云南、天生桥及三峡等将向广东送电10000MW,南方4省将形成世界上最大的交直流互联电网。有关的系统研究表明,在一定的电网结构下,影响广东电网受电能力的关键因素是受端电网的无功电压支撑及交直流系统相互配合问题。In order to coordinate the great developing western china strategy,10million kilowatts of electricity will be transmitted from Guizhou,Yunnan,TianShengQiao and Three-Gorges to Guangdong Province by the end of the Tenth Five-Year Plan period(2001~2005).The4Provinces of southern china will form the largest AC-DC interconnecting power network on the world.According to the study of related system,for the certain structure of power network,the key factor influencing the ability for Guangdong net-work to receive electric power is the support of reactive power at the receiving power network and the cooperation of AC system with DC system.
分 类 号:TM727.1[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28