The Burning Question  

The Burning Question

在线阅读下载全文

作  者:Wang Hairong 

出  处:《Beijing Review》2014年第30期32-33,共2页北京周报(英文版)

摘  要:Once a week, on every Saturday since July 10, the Guangzhou No.1 Resource Thermo Power Plant in south China's Guangdong Province opens its door to visi- tors, While most thermal power plants in China are coal-fired, this plant burns a more unusual fuel---municipal waste. Located in Yongxin8 Village, Baiyun District of Guangzhou, the plant--also known as the Ukeng Waste Incinerator---is one of seven solid waste incinerators that have and will be built in the capital city of Guansdong. The first phase of the plant was put into use in January 2006 and can dispose of 1,040 tons of waste a day. The second phase, which has been in operation sinceJune 2013, can handle 2,250 tons daily.Waste incinerators,efficient at garbage disposal,are met with a skeptical public By Wang Hairong Once a week,on every Saturday since July 10,the Guangzhou No.1 Resource Thermo Power Plant in south

关 键 词:燃烧 中国南部 废物焚烧炉 垃圾焚烧炉 城市垃圾 广东省 热电厂 火电厂 

分 类 号:X705[环境科学与工程—环境工程] TK227.1[动力工程及工程热物理—动力机械及工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象