电厂机组循环水取水口预留岩坎围堰拆除爆破  被引量:4

DEMOLITION BLASTING OF RESERVED ROCK RIDGE COFFERDAM FOR INTAKE OF CIRCULATING WATER OF UNITS IN ELECTRIC POWER PLANT

在线阅读下载全文

作  者:邵晓宁[1] 张道振 周恩泉 郑露静 

机构地区:[1]安徽理工大学能源与安全学院,安徽淮南232001 [2]浙江民能爆破工程咨询有限公司,杭州310012

出  处:《工程爆破》2014年第3期25-28,共4页Engineering Blasting

摘  要:介绍了电厂燃煤机组循环水取水口预留岩坎围堰的拆除爆破。针对围堰周边环境复杂的特点,从制定安全控制标准入手,进行爆破方案和爆破参数的设计,校核了爆破振动和水击波有害效应,并对过流危害采取了安全控制措施。爆破取得了预期效果,可为类似围堰拆除爆破工程提供参考。The demolition blasting of reserved rock ridge cofferdam for intake of circulating water of coal fired units in electric power plant was discussed. Aiming at complex surroundings of cofferdam to design blasting scheme and blasting parameters from standard of safety control, the blasting vibration and harmful effects caused by water hammer wave were checked, and safe measures to control harms of overflow were adopted. Expected blasting result was achieved and it could be a reference to similar projects.

关 键 词:岩坎 围堰 拆除爆破 爆破参数 安全防护 

分 类 号:TV542[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象