25MW汽轮机转子掉叶片的配重处理  

Counterweight Handling for Fallen Blade Failure of a 25MW Steam Turbine Rotor

在线阅读下载全文

作  者:纪烈鹏 周伟民 

机构地区:[1]中国石油化工股份有限公司天津分公司,天津300271

出  处:《发电设备》2014年第4期285-287,共3页Power Equipment

摘  要:针对某热电厂25MW汽轮机组运行中突发掉叶片事故,提出对汽轮机转子进行平衡配重处理,通过计算、称重、加装等步骤使汽轮机在短期内完成了抢修,重新投入了生产运行;并介绍了该汽轮机检修加配重处理的过程及方法。实践表明:采取临时加配重处理不失为一种较好的选择。To overcome the fallen blade failure occurring to a 25 MW steam turbine unit during operation, it is suggested to perform counterweight handling to the steam turbine rotor. Through careful calculation, weighing and installation, the steam turbine was repaired and back to work in a short time. Specific procedures of the overhaul by adding counterweight to the steam turbine are described. Operation practice shows that the method of adding counterweight temporarily is quite a better choice.

关 键 词:汽轮机 掉叶片 转子不平衡 振动 配重 

分 类 号:TK268[动力工程及工程热物理—动力机械及工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象