变电站220kV侧单相短路电流超标问题分析及解决方案  被引量:6

Analysis of Single Phase Short Circuit Exceed on Transformer Substation 220 kV Bus and Its Solving Measures

在线阅读下载全文

作  者:王薇[1] 杜飞 

机构地区:[1]内蒙古电力勘测设计院,呼和浩特010020 [2]薛家湾供电局,内蒙古鄂尔多斯010300

出  处:《内蒙古电力技术》2014年第3期28-32,39,共6页Inner Mongolia Electric Power

摘  要:吉兰太变电站是内蒙古电网的一座500 kV枢纽变电站,该变电站3台主变压器并列运行,随着新增电源项目的接入,变电站220 kV侧单相短路电流值将达到50.2 kA,超出开关设备的额定遮断容量(50 kA),影响电网的安全稳定运行。针对该问题,提出减少接地点、在主变压器中性点加装小电抗、将主变压器220 kV母线分裂运行及建设第4台主变压器等解决方案,并对采取各方案后吉兰太变电站220 kV侧单相短路电流进行了计算分析,其中,采用在主变压器中性点装设小电抗方法可将短路电流降低约6kA,建议采用该方案。Jilantai Substation is an important 500 kV substation in Inner Mongolian Grid. 3 main transformers parallel operate, along with several power plant generators puting in operation, single phase short circuit of Jilantai 220 kV bus is 50.2 kA, exceeding the rated capacity of circuit breakers. This problem will seriously threaten the safty of power system.Be aimed at this problem,several methods was discussed to reduce single phase short circuit of Jilantai 220 kV bus, including reduing ground point, installing small neutral reactor on transformer, and spliting operation 220 kV bus, and building the forth transformer. Meanwhile calculated the short circuit of Jilantai 220 kV bus base of above methods. The decreasing amplitude of 2nd method was 6 kA. Through detail analysis, installing small neutral reactor on transformer was the most available method.

关 键 词:500 KV变电站 单相短路电流 额定遮断容量 接地点 中性点小电抗 分裂运行 

分 类 号:TM713[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象