检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]广东省水利电力勘测设计研究院,广东广州510635
出 处:《吉林水利》2014年第7期20-22,28,共4页Jilin Water Resources
摘 要:从最严格水资源管理制度的内涵出发,总结了在取用水总量接近控制指标地区,新建项目取用水水源的4条解决途径;并以某热电联产项目为例,对主要用水环节进行分析,提出采用地表水和再生水混合取水的优化水源配置方案,可符合区域取用水总量控制的要求和满足项目取用水要求,并对区域水环境保护产生积极作用。该项目水源配置优化方案可为同类型项目提供借鉴。Studying the connotation of carrying out strict management regulations of water resources.This paper generalized about four solutions to the new project water intaking which located the place where the amount of water consumption is approaching the index of total quantity control; And taking a cogeneration project as an example, it analyzed the main aspects of water consumption, scheme optimization programme that surface water and recycled water mixed,which is complying with the index of total quantity control, and meetting the project requirement,also conduciving to water environment protection.The water intake scheme optimization programme is a good reference for the same type of project.
分 类 号:TV213.4[水利工程—水文学及水资源]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15