检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:邱元瑞[1] 李家库 胡勇科 谢博涵 许婧[2] 李钊[1]
机构地区:[1]中国石油冀东油田工程监督中心,河北唐山063299 [2]中国石油冀东油田开发技术公司
出 处:《石油地质与工程》2013年第6期138-141,153,共4页Petroleum Geology and Engineering
摘 要:为解决冀东油田南堡三号构造深层井段完井期间井漏与溢流并存问题,对施工井采用了承压堵漏技术,应用了新型堵漏材料BZ-SPA和KT。介绍了NP3-20井四开完井井段新型BZ-SPA和KT堵漏材料的应用情况,应用结果表明,采用该新型堵漏材料承压堵漏技术和分段间歇式堵漏工艺有效地提高了长裸眼井段钻井液安全密度窗口,增强了地层承压能力,保证了完井期间井控安全,为完井测井、固井等施工提供了良好的井眼条件。In order to solve the co-existing problem of well leakage and overflow during the period of well completion of No.3 structural deep well of Nanpu,pressure sealing technology has been adopted for construction wells and new type plugging material BZSPA and KT has been applied.The application of new BZ-SPA and KT plugging material has been introduced in this paper.The application results indicate by adopting the new type pressure sealing technology and staging intermittent plugging technology,to improve the safe drilling fluid density window of long open hole section,enhance the capacity of the formation pressure,ensure the safety of the well control during well completion and provides good borehole conditions for completion construction such as well logging and well cementation.
分 类 号:TE357[石油与天然气工程—油气田开发工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.171