检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]大连理工大学,大连116024
出 处:《中国机械工程》2014年第14期1967-1972,共6页China Mechanical Engineering
基 金:国家重点基础研究发展计划(973计划)资助项目(2009CB724307)
摘 要:利用数值模拟法对缩尺AP1000空槽定子铁芯与定子屏蔽构件的装配过程进行了研究。首先提出了5种不同内压加载路径的装配过程,通过分析成形能力确定了较为合适的加载路径;接着在此加载路径基础上分析了成形能力与内压力关系随初始间隙变化的规律;最后分析了不同摩擦因数对装配过程的影响。研究表明:数值模拟法有助于装配方案的确定以及装配效果的预测;装配中存在一定的摩擦可获得到较好的装配效果。Numerical simulations were conducted to study the hydro forming assembly of the AP1000 stator components. Firstly,five different loading paths were suggested to study the assembly effects. A suitable loading path was obtained based on the analyses of the formability. Then the relationships between the bulge ability and the internal pressure with the change of the initial clearance were analyzed. Finally, the effects of the coefficient of friction on the assembly process were examined. The results show that the simulation method benefits the determination of assembly process and the prediction of assembly effects,and a better assembly result can be obtained by a proper coefficient of friction.
关 键 词:定子组件装配 液压成形 载荷路径 胀形量 液压力 摩擦因数
分 类 号:TH162.1[机械工程—机械制造及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15