综采工作面厚顶板强制放顶技术  被引量:5

Thick Roof Forced Caving Technology at Fully Mechanized Mining Face

在线阅读下载全文

作  者:温贺兴[1,2] 杜福荣[1,2] 

机构地区:[1]内蒙古科技大学矿业工程学院,内蒙古包头014010 [2]内蒙古煤炭安全开采与利用工程技术研究中心,内蒙古包头014010

出  处:《煤矿安全》2014年第7期77-79,共3页Safety in Coal Mines

摘  要:针对霍洛湾矿直接套用神东强制放顶的经验办法效果不佳的情况。结合22202工作面的地质情况,基于理论分析、数值模拟、现场经验的方法对强制放顶方案进行优化并实施。放顶后观察到支架后方矸石堆积饱满,呈凸字形;工作面在推进到30 m时基本顶断裂,初次来压步距38.5 m,减小了1~2倍的周期来压步距长度,矿压显现为周期来压等级,方案取得了良好效果。Aiming at the bad effect that huoluowan Coal Mine directly used the readymade experiences and methods on forced caving of shendong Mining Area, combining the practical conditions in 22202 working face of huoluowan Coal Mine, the optimization of forced caving scheme was carried out based on methods of theoretical analysis, numerical simulation and field experience. The gangue showed convex type and accumulation plumpness was observed behind support. The basic roof was break when working face advanced 30 m far from open- off cut, the first weighting step distance was 38.5 m, which decreased 1 to 2 times of the period weighting step distance, strata behaviors level basically consistent with the period weighting. The optimization scheme has get good results.

关 键 词:近浅埋煤层 初采 厚顶板 强制放顶 半边O型 炮眼布置 

分 类 号:TD823.494[矿业工程—煤矿开采]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象