检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]东南大学混凝土及预应力混凝土结构教育部重点实验室,江苏南京210096 [2]东南大学国家预应力工程技术研究中心,江苏南京210096
出 处:《施工技术》2014年第14期28-32,共5页Construction Technology
基 金:"十二五"国家科技支撑计划课题(2012BAJ03B06)
摘 要:绍兴山水馆C馆为钢桁架弦支穹顶组合网壳结构,通过对中心弦支穹顶结构的施工过程进行张拉分析,提出了逐环分批次循环张拉径向钢拉杆的施工方案,在结构中建立设计预应力的同时可以有效控制结构形态,并且减少了张拉设备的投入。通过对铸钢索夹节点进行抗滑移模型试验,得出索夹抗滑承载力为350kN,大于节点最大不平衡力200kN,可以满足工程要求。C pavilion of Shanshui Pavilions in Shaoxing is a composite structure of suspendome with reticulated shell and reinforced truss. Taking into account the tension analysis of the center suspendome due to the construction process, this paper has put forward a method of tensioning the radial steel rod by ring cycle in batches to stretch the cable-strut system of suspendome. It can establish the designed prestress accurately, control the morphology effectively, and reduce the investment of tensioning device. Through the cable clips model test for anti-slip, the carrying capacity of anti-sliding of cable clips is 350kN, which is greater than the maximum node unbalanced force 200kN, that can meet the engineering requirements.
分 类 号:TU758[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145