大断面小净距隧道中间岩柱加固方案研究  被引量:14

The Research about Strengthening Project of Middle Rock Pillars in the Big Section and Small Clear Distance Tunnel

在线阅读下载全文

作  者:陈佳[1] 

机构地区:[1]中铁十八局集团隧道工程有限公司,重庆410008

出  处:《公路工程》2014年第4期202-206,共5页Highway Engineering

摘  要:探讨了在质量较差的Ⅴ级围岩中大断面小净距隧道中间岩柱加固方案,得出当左右洞之间的距离小于最小净距时,对中间岩柱进行注浆加固能很好地改善隧道洞周位移及衬砌内力,而对中间岩柱进行对拉预应力锚杆加固并不能起到很好的效果。对大断面小净距隧道中间岩柱的加固有一定的借鉴意义。This paper discusses middle roc pillars reinforcement scheme in the poor quality surrounding rock in the big section and small clear distance tunnel , it is concluded that when the distance of the two hole less than the minimum interval, the grouting reinforcement in middle rock pillars can perfect the displacement and internal force lining in tunnel, and prestressed anchor reinforcement in middle rock pillars does not have very good effect. This paper have certain reference significance for the reinforcement of middle rock pillars in the large section and small clear distance tunnel.

关 键 词:大断面 小净距 中间岩柱 注浆 预应力锚杆 

分 类 号:U457.3[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象