临时支护配合间隔进路式开采方法在顶底柱残矿回采中的应用  

Application for stoping residual ore of the roof and bottom pillar by interchanging tunnel mining method with temporary support

在线阅读下载全文

作  者:马武[1] 彭联合 朱志华[1] 

机构地区:[1]水口山有色金属有限责任公司,湖南衡阳421513

出  处:《有色金属(矿山部分)》2014年第4期11-13,共3页NONFERROUS METALS(Mining Section)

摘  要:在康家湾开展顶底柱残矿回采已有十多年的历史,积累了丰富的经验,总结提出了顶底柱残矿进行回采的临时支护配合间隔式进路回采方法。通过十多年的实践,回采出20余万t高品位顶底柱残富矿,取得了良好的效果,证明该种施工方法和工艺流程非常适用顶底柱残矿安全高效回采。分析总结该施工方法的支护参数和施工工艺,对国内使用充填采矿法的矿山安全回采顶底柱残矿具有重要的作用和意义。The history of stoping residual ore of the roof and bottom pillar in Kangjiawan has more than 10 years, so rich experience in practice is accumulated. It summarized and proposed a interchanging tunnel mining method with temporary support for stoping residual ore of the roof and bottom pillar. 20 million tons of residual ore of the roof and bottom pillar with high grade has been extracted through many years of practice, and it had got good effects. The construction method and technological process are very applicable to stoping residual ore of the roof and bottom pillar in safety and high efficiency. This paper summarized support parameters and technological process of this construction method, and it plays an important role in the use of stoping residual ore of the roof and bottom pillar with back-filling method for domestic mines.

关 键 词:金属矿地下开采 间隔进路式 临时支护 顶底柱 残矿回采 

分 类 号:TD853.35[矿业工程—金属矿开采]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象