检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]北京矿冶研究总院,北京102600
出 处:《有色金属(矿山部分)》2014年第4期67-70,共4页NONFERROUS METALS(Mining Section)
基 金:"十二五"国家科技支撑计划项目(2012BAK09B03;2012BAB01B04);国家国际科技合作专项(2011DFA71990);科研院所技术开发研究专项(2012EG115003);北京矿冶研究总院科研基金项目(YJ-2012-01)
摘 要:单一的地压监测尺度已经不能满足矿柱回采过程中对不同尺度岩体安全监测的需求,针对该问题提出了"宏观与微观结合,整体与局部协同"的"最优化"原则,采用微震、应力、应变、位移等不同监测尺度的地压监测技术对某磷矿试验盘区矿柱回采过程中的地压活动进行监测,并指导矿山安全回采矿柱,取得了良好的效果。The single ground pressure monitoring scale can't meet the needs of safety monitoring for different scales of rock mass during the process of ore pillar stoping. The "optimization" principle that "macro and micro combination, whole and local coordination" is proposed to solve the problem in this paper. Different scales of ground pressure monitoring technologies, such as microseismic, stress, strain and displacement, are used to monitor the ground pressure activities of a phosphate ore test panel during the process of ore pillar stoping. It is utilized to guide the mine stoping ore pillar safely, which has achieved a good result.
关 键 词:矿柱回采 不同尺度 地压监测 区域监测 局部监测
分 类 号:TD76[矿业工程—矿井通风与安全]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28