某工程冲孔灌注桩静载不合格问题的分析及处理  被引量:1

Analysis and Treatment of the Unqualified Punch Cast- in- situ Pile on Static Loading Test

在线阅读下载全文

作  者:郑增旭 

机构地区:[1]厦门极坐标设计事务有限公司,福建厦门361012

出  处:《福建建筑》2014年第7期98-101,共4页Fujian Architecture & Construction

摘  要:某工程原设计基础为冲孔灌注桩,但桩基施工后静载试验的单桩承载力特征值仅为设计单桩承载力特征值的50%~60%,通过对地勘资料和现场施工记录的分析,提出了几种不同的基础加强方案进行比选,最终采用增设PHC管桩进行地基处理的天然筏板基础方案,通过后期的沉降观测与土压力、桩顶反力监测证明该方案实施效果良好,对类似工程具有一定的参考意义。The original design of one engineering project was based on punch cast - in - situ pile, but the actual characteristic value of single pile bearing ca- pacity accounted for only 50% -60% of the desired value on static loading test after pile foundation construction. Comparing with several different schemes proposed for foundation strengthen by geological survey report and site construction record, the feasible scheme was add several PHC pipe piles as natural raft foundation for ground treatment, which showed good effect and also had some reference value to similar engineering projects by later settlement observation and measurement of earth pressure & reaction force at pile top.

关 键 词:冲孔灌注桩 静载试验 单桩承载力特征值 PHC管桩 地基处理 沉降观测 

分 类 号:TU473.1[建筑科学—结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象