作 者:郑添寿
机构地区:[1]福建省岩土与环境企业工程技术研究中心,福建龙岩364000 [2]福建永强岩土工程有限公司,福建龙岩364000
出 处:《福建建筑》2014年第7期102-104,共3页Fujian Architecture & Construction
摘 要:采用人工挖孔桩加固岩溶塌陷受损建(构)筑物基础,因受施工空间限制无法采用超前钻探揭示桩端持力层下部岩层情况,可能存在隐伏溶洞,对基础加固存在风险。本文结合工程实例,在岩溶塌陷治理采用人工挖孔桩中预埋钢管,探明持力层下部潜伏溶洞情况及对发现的溶洞进行注浆充填处理,阐述了岩溶注浆加固的设计方案、施工工艺、注浆量计算及技术要求。经多种手段检验,表明注浆加固效果良好。Manual - digging pile used to reinforce the damaged buildings ( structures ) foundation in karst collapse has advantages of high bearing capacity,guaranteed quality, low cost, simple equipment and the impact of the construction space is small. However, in karst area,the geological condition is complex, the lower part latent caverns in bearing stratum are often unable to clearly ascertain their shapes and sizes. It has risk to use hand - dug pile only. The applica- tion of manual - digging pile embedded pipe grouting technology is introduced in karst collapse combining with an engineering example, the stratum of caves can be ascertained and the caves can be filled by using manual - digging pile embedded steel pipe in the karst collapse disaster.
分 类 号:P642.253[天文地球—工程地质学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222