五沟煤矿导水裂隙带发育高度预测  

Research onset Safety Pillar Prevent Sand in WuGou Coal Mine

在线阅读下载全文

作  者:李小庆[1] 宣以琼[1] 朱凯[1] 

机构地区:[1]安徽建筑大学土木工程学院,安徽合肥230022

出  处:《安徽建筑工业学院学报(自然科学版)》2014年第3期75-77,106,共4页Journal of Anhui Institute of Architecture(Natural Science)

基  金:国家自然科学基金项目(No.51274007)

摘  要:煤层开采导致覆岩产生移动变形破坏,描述覆岩破坏影响程度的导水裂隙带发育高度是评价顶板是否发生突水溃砂等灾害事故的重要指标之一,因此对影响导水裂隙带发育高度的采高、工作面几何参数、覆岩岩性及岩层结构等主要因素进行分析,利用模糊数学方法将非线性问题转换成线性问题进行计算,获得五沟煤矿10煤开采导水裂隙带发育高度预测公式,为五沟煤矿含水层下10煤层的安全开采提供指导。Coal mining causes overburden strata and failure state,failure situation is described by the height of water conducting fractured zone.It's one of important indexes that evaluate whether roof occur water inrush accident.So analyzing main factors that parameters of working face,structures of rock strata that affects the height of water conducting fractured zone.It was used fuzzy mathematics method to convert nonlinear problem into a linear problem,and the formula of the height of water conducting fractured zone was got.It should be provide guidance for coalmining face safety mining.

关 键 词:导水裂隙带 岩层结构 模糊数学 计算采高 

分 类 号:TD323[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象