检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张毅[1]
出 处:《电气开关》2014年第4期84-86,共3页Electric Switchgear
摘 要:失步解列控制可在电力系统失步时,做出解列、切机、切负荷或启动其他使系统再同期的控制措施,是防止电力系统在复杂故障情况下事故扩大而导致大面积停电进而崩溃的最后一道防线。介绍了电力系统失步解列现象以及目前电网解列装置常用的五种失步判据,并重点分析基于ucosφ的判据方式,阐述了陡河发电厂二号站配备失步解列装置的必要性及方案。Step out off-the-line control can make off-the-line, switching device, suitching load or start other control measures to the system synchronism again. It is the last defence to prevent the power system in complex fault conditions to be broadened leading to large area power failure. The paper presents the power system step out phenomenon and com- mon fire step out criteria of electric network off-the-line device at present, and analyzes criterion method based on ucosq and expounds necessity and scheme for the step out off-the-line device to be equipped in No. 2 set of Douhe Power Station.
分 类 号:TM71[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.140.192.22