检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李金贵[1,2]
机构地区:[1]太原理工大学,山西太原030024 [2]霍州煤电集团汾源煤业公司,山西霍州035100
出 处:《煤炭工程》2014年第8期12-14,共3页Coal Engineering
基 金:霍州煤电高层专业人才实践工程资助项目(HMGS2012XX)
摘 要:针对“三软”厚煤层综放工作面护巷煤柱尺寸展开研究,通过理论计算得到文明煤矿5^#煤层的两综放工作面之间留设煤柱尺寸不小于19.8m,为进一步验证理论计算的客观性,采用计算机数值模拟了15m、20m、25m、30m、35m、40m六种方案煤柱稳定性与支承应力分布情况,最终确定留设煤柱尺寸为20~25m之间。The paper had a study on a size of the protective coal pillar of the gateway in fully mechanized top coal caving mining face in thick seam with soft roof, soft coal and soft floor. With a theoretical calculation, a size of the coal pillar left between two fully mechanized top coal caving mining faces in No. 5 seam of Wenming Mine should not be less than 19. 8m. In order to further approve the theoretical calculated objectivity, a computation numerical value was applied to simulate a stability and support stress distribution of the comprehensive coal pillar with six plans of 15m, 20m, 25m, 30m, 35m and 40m. The final size of the coal pillar left was about 20 -25m.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.127