Gomal Zam大坝岩体灌浆试验研究  

Analysis on Grout Testing for Gomal Zam Dam Project

在线阅读下载全文

作  者:许仙娥[1] 段世委[2] 

机构地区:[1]中水北方勘测设计研究有限责任公司,天津300222 [2]水利部水利水电规划设计总院,北京100120

出  处:《资源环境与工程》2014年第4期557-559,572,共4页Resources Environment & Engineering

摘  要:Gomal Zam大坝坝基岩体变形模量低,渗透性较强,不能满足设计要求,需采取固结灌浆处理,为此进行了灌浆试验。灌浆试验成果表明坝基岩体的可灌性好,通过3序次灌浆后,岩体的地震波速度显著提高,透水性满足设计要求,且岩体的完整性和均一性得到改善。通过灌浆试验确定了合理的灌浆孔间距、灌浆压力等坝基固结灌浆施工参数。Since the foundation rocks of Gomal Zam Dam Project cant meet the design requirements for gravity dam due to their low deformation modulus and high to moderate permeability, complete consolidation grouting of foundation rocks would be necessary. Thus, grout test is planned and performed. As the results of geophysical prospecting and packer tests before and after grouting shown that longitudinal wave velocity, integrity coefficient and homogeneity is all improved to a great extent by three series grouting, as well as permeability of rock mass meets the design requirements, the groutability of jointed foundation rock mass at Gomal Zam dam site is satisfied. Meanwhile, reasonable grouting parameters, such as spacing of grout holes, ratio of water and cement and grouting pressure, are proposed for complete consolidation grout during construction stage.

关 键 词:灌浆试验 岩体质量 Gomal Zam 

分 类 号:TV543.15[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象