天津117项目暖通空调设计  被引量:1

HVAC design of project 117 in Tianjing

在线阅读下载全文

作  者:左涛 沃立成 万嘉凤 虞世放 李伟刚 马伟骏 

机构地区:[1]华东建筑设计研究总院

出  处:《暖通空调》2014年第8期38-41,共4页Heating Ventilating & Air Conditioning

摘  要:介绍了该超高层建筑的水系统分区、中承压管道设计、电梯井烟囱效应、防排烟设计等。该工程中水系统的承压突破了1.6MPa,甚至超过了2.5MPa而达到3.0MPa,对管道和管件的强度计算和应力计算提出了新的要求。冬季室内外空气的密度差产生的电梯井烟囱效应会导致超高层建筑首层高区的电梯门难以关闭,简要介绍了该项目采取的技术措施。Presents the vertical zoning of chilled water system,middle-pressure pipe design,stack effect of elevator shaft,and smoke control and exhaust system design.In this project,the working pressure of chilled water system exceeds 1.6 MPa and 2.5 MPa,and reaches 3.0 MPa,which proposes new requirement for strength calculation and stress calculation.For super high-rise building,the air density difference between indoor and outdoor results in stack effect of elevator shaft,which will make the elevator door on the ground floor unable to close.Briefly introduces the technical measures used in the building.

关 键 词:超高层建筑 中承压管道 电梯井 烟囱效应 防排烟 强度计算 应力 

分 类 号:TU83[建筑科学—供热、供燃气、通风及空调工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象