检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张开臣[1]
机构地区:[1]北京市建筑工程研究院有限责任公司,北京100039
出 处:《施工技术》2014年第15期30-33,58,共5页Construction Technology
摘 要:近几年,随着铁路线路的进一步提速及国家基础建设投资的加大,新一轮高标准的新建及改扩建火车站房工程层出不穷。新建及改扩建站房对大跨度、重荷载等使用功能要求的不断提高,使得高效预应力混凝土技术在此类大型工程中得到了广泛应用,并取得了良好的经济效益和社会效益。以广州南站、石家庄站为例,着重介绍预应力混凝土技术在新建及改扩建火车站房中的应用中遇到的难点及解决方法。In recent years,with the increasing speed and national infrastructure investment of railway line,a new round of high standards of new and renovated railroad station project emerge in an endless stream. With the improving requirements of large span and heavy load,efficient prestressed concrete technology is widely applied in such large project,which obtained the good economic and social benefit.Taking Guangzhou South Railway Station and Shijiazhuang Railway Station as example,this paper introduces the difficulties in application of prestressed concrete technology in detail.
分 类 号:TU528.571[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249