检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]总参谋部工程兵科研三所,河南洛阳471023 [2]葛洲坝集团基础工程有限公司,武汉430000
出 处:《土工基础》2014年第4期5-7,26,共4页Soil Engineering and Foundation
摘 要:武汉市长江航运中心属超大面积深基坑工程,地质勘查发现,对基坑开挖影响最大的软~流塑、高压缩性、强度较低的粉质粘土夹粉土在整个场地均有分布,因紧邻长江,基坑工程还将面临极为严峻的承压水影响问题。基于地质水文条件,地下二层区域采用常规的钻孔灌注桩结合三轴水泥土搅拌桩止水帷幕作为支护体。对于地下三层区域,其受承压水影响严重,止水帷幕深度较大。TRD工法地下连续墙可施工的深度较大,而且地层适应性也广,可满足本工程隔断地下水的要求,因此,地下三层区域选择地下连续墙(TRD工法)支护体。Ⅰ区和Ⅱ区的水平支撑均采用对撑结合边桁架支撑。The Yangtze River Navigation Administration Center Project is located at the intersection of Yuanjiang Boulevard and Minsheng Road in Jiangan District. The proposed building has a total area of 46,000 m^2 with a building area of 31,500 m^2. The foundation excavation area is 38,600 m^2, with a perimeter f 888 meters. The proposed excavation depth varies from 10.7 to 21.9 meters and this type of deep excavation can be classified as super-large excavation project. Based on the hydrological and geological conditions at site, the conventional cast-in-place reinforced concrete pile with three-axis cement mixing curtain as a seepage cut-off wall was used as supporting system in areas with two-story underground spaces. In areas with three-story un- derground spaces, the hydraulic pressure is high due to the required excavation depth. The slurry wails formed by the Trench Cutting Remixing Deep Wall (TRD method was used. The TRD walls can have a large structural depth and is applicable in a wide variety of subsurface conditions. The cross strut supports with corner supports using truss system in the horizontal direction are used in both areas.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3