基于模型冰试验的多腿柱导管架平台结构最大冰载荷计算新方法——以渤海绥中36-1油田AII井口平台为例  被引量:2

New calculation method for the maximum ice load on multi-leg jacket based on ice model test result:case of SZ36-1 oilfield WHP-AⅡin Bohai Sea

在线阅读下载全文

作  者:张树德 孙振平 

机构地区:[1]中海石油中国有限公司丽水36-1气田开发工程项目组

出  处:《中国海上油气》2014年第A01期17-19,24,共4页China Offshore Oil and Gas

摘  要:针对绥中36-1油田AⅡ井口平台上部组块载荷不能满足桩基承载力安全系数规范要求的问题,在总结抗冰结构设计实践的基础上,进行了模型冰试验。基于模型冰试验结果,提出了新的多腿柱导管架平台结构最大设计冰载荷的计算方法,解决了设计冰力与实际受力之间差别过大而导致的桩基承载力安全系数不能满足规范要求的问题,对今后井口平台、综合平台基础导管架抗冰设计具有一定的参考价值。To solve the problem that the upper loads could not meet with the safety demand for the pile foundation of SZ36-1 oilfield WHP-A Ⅱ , the ice model test was performed based on the experiences of former ice resistant structure designs. A new calculation method for the maximum ice load on multileg jacket is proposed to solve the problem that big difference between design load and actual stress could not meet the safety demand for pile foundation. The research could provide a well reference to the ice resistant structure designs.

关 键 词:多腿柱导管架 模型冰试验 最大冰载荷 计算方法 绥中36-1油田 

分 类 号:TE973.92[石油与天然气工程—石油机械设备]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象