检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:郑凌蔚[1] 刘士荣[1,2,3] 周文君[2,3] 李金龙[2,3] 吴舜裕[2,3]
机构地区:[1]华东理工大学自动化研究所,上海200237 [2]杭州电子科技大学电气自动化研究所,浙江杭州310018 [3]检测仪表与自动化系统集成技术教育部工程研究中心,浙江杭州310018
出 处:《电力系统保护与控制》2014年第17期31-37,共7页Power System Protection and Control
基 金:浙江省科技计划重大专项(2009C11020);浙江省自然科学基金(LQ12E07001)
摘 要:为了准确地配置并网型分布式发电系统容量,针对并网型风光混合发电系统,给出一种基于发电效率衰减、分时电价和负荷逐年增长等条件的并网型分布式发电系统容量优化配置方法。利用NASA气象网站的风速和日照辐射资料,生成单位容量风光电源的年度出力曲线,根据风光电源的年度衰减性,在单一电价、分段电价和本地消纳的不同应用场景下,对固定负荷和逐年增长负荷建立起分布式电源容量优化模型。在实例分析中,通过遗传算法求解,验证了该方法的有效性和正确性。该模型更加贴近实际工程应用,并能很好地扩展到包含多种分布式电源的并网型发电系统中,有利于并网型分布式发电系统的应用和推广。In order to configure accurately the capacity of grid-connected distributed generation system, a method of distributed generation system capacity optimization and configuration based on power generation efficiency attenuation, time-of-use electricity price and load increasing year by year which aims at the grid-connected wind-photovoltaic hybrid power generation system is given. Using the wind speed and sunshine radiation data of NASA's meteorological sites, annual output curve of unit capacity wind-photovoltaic power supply is obtained, the distributed generation planning model is established aiming at fixed load and increasing load in the scenario of single electricity price, time-of-use electricity price and elimination on the spot. In the case analysis, genetic algorithm is used to solve the equation, the method’s validity and correctness are verified. The model is more close to the actual engineering application, and it is easy to expand to grid-connected power generation system that includes a variety of distributed power, it is helpful for the application and promotion of grid-connected distributed generation system.
分 类 号:TM61[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.166