检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]南京工业大学土木工程学院,江苏南京211816
出 处:《江苏建筑》2014年第4期72-74,共3页Jiangsu Construction
摘 要:芜湖侨鸿A区塔楼超高层核心筒结构施工中采用了集成式电动爬模系统,其对于变层高、截面内收等情况均有成熟的技术处理措施,合理高效地解决了施工中常见的立体交叉施工难题,实现了安全施工、优质快捷的施工目标。Integrated electric climbing form system is applied in a super high-rise building with core wall structure inside and steel frame structure outside in Wuhu. During construction, the problems of changes in storey height and section of core wall is successfully fixed due to the system, the stereoscopic cross construction problems usually encountered is dealt with reasonably and efficiently. The aim for safe construction, efficiency and high quality is well achieved.
分 类 号:TU741.3[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3