EPR1700核电机组接入黑龙江电网适应性分析  

Analysis on Adaptability of EPR1700 Nuclear Power Plant Integrating into Heilongjiang Power Grid

在线阅读下载全文

作  者:李时莹[1] 赵洪生[1] 

机构地区:[1]东北电力设计院,长春130021

出  处:《吉林电力》2014年第4期1-4,共4页Jilin Electric Power

摘  要:在分析黑龙江省电力市场空间和能源资源供应形势的基础上,从电网潮流分布、导线型号选择、稳定校验、经济性分析及系统调峰要求等多方面,分析了EPR1700核电机组接入黑龙江电网的适应性。研究结果表明,随着黑龙江省负荷发展,全省能源供需情况将由现有的基本平衡转入亏缺状态,将核电机组接入黑龙江电网是适宜的,但考虑到黑龙江省自身电源结构及发展,核电厂应积极参与系统调峰。According to the analysis on the space and energy sources supplying situation of Heilongjiang power market, the adaptability of EPR1700 nuclear power unit integrating into Heilongjiang power grid has been analyzed with the consideration of grid flow distribution, cable type selection, stability verification, economic analysis and system peak regulation demand etc. Research results show that it is considerable for nuclear power unit integrating into Heiiongjiang power grid. With the consideration of power source structure of Heilongjiang power grid and its development, the future nuclear power plant should take an active part in system peak regulation.

关 键 词:EPR1700核电机组 黑龙江电网 适应性 

分 类 号:TM623[电气工程—电力系统及自动化] TM715

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象