检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]长城钻探工程有限公司解释研究中心,北京100101 [2]中国石油勘探开发研究院,北京100083
出 处:《油气井测试》2014年第4期22-23,76,共2页Well Testing
摘 要:开关井制度是试井设计的核心内容,对于修正等时试井,如何确定开井期间油嘴的大小,在测试现场大多是靠经验设定,常常造成测试失败或增大解释结果的误差。以ZBX水平井为例,讨论了如何选择测试时油嘴大小,以及施工过程中需要考虑的相关因素,认为等时试井之间需要较长时间的开井,以便洗干净整个井筒;对于低渗产能较低气井,测试时油嘴应由小到大。Open /shut in schedule is the core content of the well test design. For the modified isochronal test,how to determine the scale of the choke during opening of the well is usually set up by experience,that e often induces the failure of test or increasing larger errors. ZBX horizontal well is taken as an example to discuss how to choose the choke sizes and what factors should be considered in the test operation. It will provide references to design well test program for the similar horizontal wells.
分 类 号:TE353[石油与天然气工程—油气田开发工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28